You might still confused with single bucket elevator load start-up problem, let’s find out the reasons on the basis of a completed project.

Conveyor equipment dominate the whole production line, two sets of bucket elevator conveyors are the key equipment into the storehouse, undertake the obligations of unloading or discharging into the storehouse. During the operation time, because of the long process routine and more relative equipment, any device failure downstream will result in a chain bucket machine downtime. If it was happened, materials accumulated at the engine base must be discharged firstly before start up.

After each bucket elevator downtime with load, open the board on the engine base and eliminate materials which were left.